Configuring jobs for EPLAN Electric P8
- Create a job with the Network (UNC) upload type.
- Go to the Network (UNC) settings section.
- In the User and Password fields, enter your credentials (the domain/user or computer name/user and your password).
- In Resource and Subdirectory, enter the directory in which the project data is stored. If the network connection is successful, select the correct directory from the dropdown menu.
- Select Check to check access to the resource.
- Go to the Advanced section.
- Enter the Sleep interval between data packets (in ms) and the Maximum size of data packets (in KB).
- To define the upload limits, select the Upload only when timestamp is different (reduces network load) checkbox.
- If required, select the Make offline project available to scripting interface checkbox.