Configuring jobs for EPLAN Electric P8

  1. Create a job with the Network (UNC) upload type.
  2. Go to the Network (UNC) settings section.
  3. In the User and Password fields, enter your credentials (the domain/user or computer name/user and your password).
  4. In Resource and Subdirectory, enter the directory in which the project data is stored. If the network connection is successful, select the correct directory from the dropdown menu.
  5. Select Check to check access to the resource.
  6. Go to the Advanced section.
  7. Enter the Sleep interval between data packets (in ms) and the Maximum size of data packets (in KB).
  8. To define the upload limits, select the Upload only when timestamp is different (reduces network load) checkbox.
  9. If required, select the Make offline project available to scripting interface checkbox.