Update: 4.0.0.24664 (August 2016)¶
The following points were addressed with this update:
- Optimizations for S7 and PCS7 regarding:
- Comparison of batch types
- Comparator of large projects
- Parallel opening of projects in Simatic Manager version 5.5.4.5
- Optimizations for hardware configuration comparison
- Optimization when hiding differences in headings
- Extension for the CSC Gateway, so that the number of communication participants is no longer limited
- Upload fix for Scalance Switches (type X320)
- Optimization of the comparison for GE-Proficy (Toolchest-Links)
- Optimizations for the Factory Floor Status
- Optimizations of the Scheduler regarding performance and resource utilization
- Display of help texts when configuring the connection paths in the job configuration